• DocumentCode
    3746182
  • Title

    A new MCTS-based algorithm for multi-objective flexible job shop scheduling problem

  • Author

    Jen-Jai Chou;Chao-Chin Liang;Hung-Chun Wu;I-Chen Wu;Tung-Ying Wu

  • Author_Institution
    Department of Physics, National Tsing Hua University, Hsinchu, Taiwan
  • fYear
    2015
  • Firstpage
    136
  • Lastpage
    141
  • Abstract
    Multi-objective flexible job-shop scheduling problem (MO-FJSP) is very important in both fields of production management and combinatorial optimization. Wu et al. proposed a Monte-Carlo Tree Search (MCTS) to solve MO-FJSP and successfully improved the performance of MCTS to find 17 Pareto solutions: 4 of Kacem 4×5, 3 of 10×7, 4 of 8×8, 4 of 10×10, and 2 of 15×10. This paper proposes a new MCTS-based algorithm for MO-FJSP problem by modifying their algorithm. Our experimental results show that our new algorithm significantly outperforms their algorithm for large problems, especially for Kacem 15×10. This shows that the new algorithm tends to have better potential of solving harder MO-FJSP problems.
  • Publisher
    ieee
  • Conference_Titel
    Technologies and Applications of Artificial Intelligence (TAAI), 2015 Conference on
  • Electronic_ISBN
    2376-6824
  • Type

    conf

  • DOI
    10.1109/TAAI.2015.7407061
  • Filename
    7407061