DocumentCode
3769646
Title
An improved algorithm for the machine scheduling problem with job delivery coordination
Author
Yuzhong Zhang;Qiongyi Zheng;Jianfeng Ren;Long Zhang
Author_Institution
School of Management, Qufu Normal University, Rizhao, China
fYear
2015
fDate
8/1/2015 12:00:00 AM
Firstpage
1
Lastpage
6
Abstract
A two-stage supply chain scheduling problem is considered, where the first stage is job production and the second stage is job delivery. The focus is on the study of the integration of production scheduling with delivery of finished products to customers. In our considered model each job can be processed on either of two identical machines, and then delivered by a vehicle to a customer location. We present an improved algorithm with the worst-case performance ratio 14/9 + ε, which improves the known upper bounds of 2 and 5/3 in [Chang, Y.C. and Lee, C.Y., E. J. O. R., 158 (2004), pp. 470-487; Zhong, W., Dosa, G. and Tan, Z.Y., E. J. O. R., 182(2007), pp. 1057-1072].
Publisher
iet
Conference_Titel
Operations Research and its Applications in Engineering, Technology and Management (ISORA 2015), 12th International Symposium on
Print_ISBN
978-1-78561-085-1
Type
conf
DOI
10.1049/cp.2015.0620
Filename
7456013
Link To Document