    Case Study on the Optimization of Construction Scheme Based on Reasonable Cost

  • Author

    Du Zuqi;Zhao Qiuhong

  • Author_Institution
    Changchun Archit. &
  • fYear
    2015
  • fDate
    6/1/2015 12:00:00 AM
  • Firstpage
    269
  • Lastpage
    271
  • Abstract
    With the continuous improvement of the efficiency of construction, many companies attach more importance to construction period and building exterior than rationality of the project cost, which leads to more and more unreasonable engineer design and construction progress so that increase the building cost. In this paper, a company in the construction of a road instance, based on a reasonable cost basis, using the multi-program comparison, improve construction program. By discussing this paper, aimed at improving the design and construction and other projects related to raising awareness of cost control units, in order to improve economic efficiency of enterprises.
  • Keywords
    "Asphalt","Concrete","Roads","Urban areas","Companies","Powders"
  • Publisher
    ieee
  • Conference_Titel
    Intelligent Computation Technology and Automation (ICICTA), 2015 8th International Conference on
  • Type

    conf

  • DOI
    10.1109/ICICTA.2015.75
  • Filename
    7473288