• DocumentCode
    377669
  • Title

    Bunch-by-bunch phase measurement at KEKB

  • Author

    Akai, K. ; Ieiri, T. ; Kawamoto, T.

  • Author_Institution
    KEK, Ibaraki, Japan
  • Volume
    3
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    2432
  • Abstract
    A fast gate module has been developed at KEKB, which can pick up the signal of one bunch from a train of bunches. The gate module is attached to a turn-by-turn beam position monitor, where the beam phase is detected by an orthogonal phase technique. Characteristics of the gate module have been investigated. We have measured the bunch phase along a long train followed by a gap. The phase shift in the train was compared with a calculation based on the transient beam loading. The longitudinal displacement of the collision point was estimated from this phase shift
  • Keywords
    colliding beam accelerators; electron accelerators; particle beam bunching; particle beam diagnostics; storage rings; KEKB; beam phase; bunch phase; bunch-by-bunch phase measurement; collision point; gate module; orthogonal phase technique; turn-by-turn beam position monitor; Acceleration; Frequency; Monitoring; Particle beams; Phase detection; Phase measurement; Signal processing; Storage rings; Switches; Voltage;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.987407
  • Filename
    987407