• DocumentCode
    378080
  • Title

    Commissioning of the Relativistic Heavy Ion Collider

  • Author

    Trbojevic, D. ; Ahrens, L. ; Blaskiewicz, M. ; Brennan, M. ; Bai, M. ; Cameron, P. ; Cardona, J. ; Connolly, R. ; de Long, J. ; Drees, A. ; Fliller, R.P. ; Fischer, W. ; Ganetis, G. ; Glenn, W. ; Hahn, H. ; Hayes, T. ; Lehrach, A. ; MacKay, W. ; Kewisch,

  • Author_Institution
    Brookhaven Nat. Lab., Upton, NY, USA
  • Volume
    4
  • fYear
    2001
  • fDate
    2001
  • Firstpage
    3138
  • Abstract
    This report describes in detail steps performed in bringing the Relativistic Heavy Ion Collider (RHIC) from the commissioning into the operational stage when collisions between 60 bunches of fully striped gold ions, were routinely provided. Corrections of the few power supply connections by beam measurements are described. Beam lifetime improvements at injection, along the acceleration are shown. The beam diagnostic results such as the Schottky detector, beam profile monitor, beam position monitors, the tune meter and others, are shown
  • Keywords
    colliding beam accelerators; commissioning; ion accelerators; particle beam diagnostics; particle beam injection; storage rings; RHIC; Relativistic Heavy Ion Collider; Schottky detector; beam diagnostics; beam lifetime; beam position monitor; beam profile monitor; commissioning; injection; power supplies; tune meter; Acceleration; Extraterrestrial measurements; Gold; Magnets; Monitoring; Orbits; Particle beams; Power measurement; Power supplies; Predictive models;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
  • Conference_Location
    Chicago, IL
  • Print_ISBN
    0-7803-7191-7
  • Type

    conf

  • DOI
    10.1109/PAC.2001.988030
  • Filename
    988030