DocumentCode
378080
Title
Commissioning of the Relativistic Heavy Ion Collider
Author
Trbojevic, D. ; Ahrens, L. ; Blaskiewicz, M. ; Brennan, M. ; Bai, M. ; Cameron, P. ; Cardona, J. ; Connolly, R. ; de Long, J. ; Drees, A. ; Fliller, R.P. ; Fischer, W. ; Ganetis, G. ; Glenn, W. ; Hahn, H. ; Hayes, T. ; Lehrach, A. ; MacKay, W. ; Kewisch,
Author_Institution
Brookhaven Nat. Lab., Upton, NY, USA
Volume
4
fYear
2001
fDate
2001
Firstpage
3138
Abstract
This report describes in detail steps performed in bringing the Relativistic Heavy Ion Collider (RHIC) from the commissioning into the operational stage when collisions between 60 bunches of fully striped gold ions, were routinely provided. Corrections of the few power supply connections by beam measurements are described. Beam lifetime improvements at injection, along the acceleration are shown. The beam diagnostic results such as the Schottky detector, beam profile monitor, beam position monitors, the tune meter and others, are shown
Keywords
colliding beam accelerators; commissioning; ion accelerators; particle beam diagnostics; particle beam injection; storage rings; RHIC; Relativistic Heavy Ion Collider; Schottky detector; beam diagnostics; beam lifetime; beam position monitor; beam profile monitor; commissioning; injection; power supplies; tune meter; Acceleration; Extraterrestrial measurements; Gold; Magnets; Monitoring; Orbits; Particle beams; Power measurement; Power supplies; Predictive models;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2001. PAC 2001. Proceedings of the 2001
Conference_Location
Chicago, IL
Print_ISBN
0-7803-7191-7
Type
conf
DOI
10.1109/PAC.2001.988030
Filename
988030
Link To Document