Title :
765 kV system introduction to Korean power system
Author :
Kim, Taeok ; Moon, Bongsoo ; Chang, Jaewon
Author_Institution :
Korea Electr. Power Corp., Seoul, South Korea
Abstract :
A 765 kV system was introduced to the Korean power system. Two transmission lines were completed in 2000 and 2001, respectively and they operated as 345 kV lines until the 765 kV substation completion at the end of 2001. We performed test runs until April 2002 for the line and substations, when commercial operation was due to begin. System prospects at the time of the feasibility study, system characteristics obtained from simulations for various operating conditions are shown in this paper. Future operation planning is also discussed.
Keywords :
power systems; power transmission lines; substations; 345 kV; 765 kV; Korean power system; future operation planning; simulations; substation completion; transmission lines; Circuit faults; Demand forecasting; Distributed parameter circuits; Power generation; Power system planning; Power systems; Power transmission lines; Substations; Supply and demand; Voltage;
Conference_Titel :
Transmission and Distribution Conference and Exhibition 2002: Asia Pacific. IEEE/PES
Print_ISBN :
0-7803-7525-4
DOI :
10.1109/TDC.2002.1177611