• DocumentCode
    398028
  • Title

    A multiagents approach for the Job Shop Scheduling problem with earliness and tardiness

  • Author

    Valencia, Leonardo Bedoya ; Rabadi, Ghaith

  • Author_Institution
    Eng. Manage. & Syst. Eng. Dept., Old Dominion Univ., Norfolk, VA, USA
  • Volume
    2
  • fYear
    2003
  • fDate
    5-8 Oct. 2003
  • Firstpage
    1217
  • Abstract
    The problem addressed in this paper is the Job Shop Scheduling problem when the objective is to minimize the total earliness and tardiness from a common due date for a set of jobs. This objective became very significant after the introduction of the Just-in-time manufacturing approach. A multiagents approach is used to solve this difficult problem. The paper presents preliminary work on modeling the problem using agents theory.
  • Keywords
    job shop scheduling; just-in-time; multi-agent systems; JIT; earliness; job shop scheduling; just-in-time manufacturing; multiagents; tardiness; Artificial intelligence; Costs; Erbium; Frequency selective surfaces; Job shop scheduling; Manufacturing; Processor scheduling; Research and development management; Single machine scheduling; Systems engineering and theory;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Systems, Man and Cybernetics, 2003. IEEE International Conference on
  • ISSN
    1062-922X
  • Print_ISBN
    0-7803-7952-7
  • Type

    conf

  • DOI
    10.1109/ICSMC.2003.1244577
  • Filename
    1244577