DocumentCode
408606
Title
Commissioning of a first-order transition jump in RHIC
Author
Kewisch, Jörg ; Montag, Christoph
Author_Institution
Brookhaven Nat. Lab., Upton, NY, USA
Volume
3
fYear
2003
fDate
12-16 May 2003
Firstpage
1694
Abstract
When accelerating gold ions in the Relativistic Heavy Ion Collider (RHIC) the transition energy must be crossed. RHIC uses a set of special quadrupoles and power supplies which can reverse polarity in less than 40 milliseconds. These quadrupoles are used to produce dispersion bumps which increase the transition energy as the beam approaches transition. The change of polarity will then jump the transition energy across the beam energy. This paper describes the commissioning of the RHIC transition crossing system.
Keywords
beam handling techniques; ion accelerators; particle beam diagnostics; storage rings; synchrotrons; RHIC; RHIC transition crossing system; Relativistic Heavy Ion Collider; accelerating gold ions; beam energy; dispersion bumps; first-order transition jump; polarity; power supplies; special quadrupoles; transition energy; Acceleration; Capacitors; Frequency; Gold; Insulated gate bipolar transistors; Power supplies; Protons; Storage rings; Switches; Voltage;
fLanguage
English
Publisher
ieee
Conference_Titel
Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
ISSN
1063-3928
Print_ISBN
0-7803-7738-9
Type
conf
DOI
10.1109/PAC.2003.1288639
Filename
1288639
Link To Document