• DocumentCode
    409281
  • Title

    R & D status of C-band accelerator unit for SUPERKEKB

  • Author

    Kamitani, T. ; Suwada, T.

  • Author_Institution
    KEK, Tsukuba, Japan
  • Volume
    2
  • fYear
    2003
  • fDate
    12-16 May 2003
  • Firstpage
    1225
  • Abstract
    In an extensive luminosity upgrade of the KEK-B factory, considered as a future plan, the injector linac has to increase the positron acceleration energy from 3.5 GeV to 8.0 GeV. In order to double the acceleration field (from 21 to 42 MV/m), a design study of the C-band accelerating unit has been started. This paper reports on the R & D status of the C-band components for a high-power test and for a beam-acceleration test at the KEKB injector linac.
  • Keywords
    linear accelerators; particle beam dynamics; particle beam injection; particle beams; 3.5 to 8.0 GeV; C-band accelerating unit; C-band accelerator; KEK-B factory; SUPERKEKB; beam-acceleration test; extensive luminosity upgrade; high-power test; injector linac; positron acceleration energy; Acceleration; Electrons; Klystrons; Linear particle accelerator; Physics; Positrons; Power generation; Research and development; Switches; Testing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Particle Accelerator Conference, 2003. PAC 2003. Proceedings of the
  • ISSN
    1063-3928
  • Print_ISBN
    0-7803-7738-9
  • Type

    conf

  • DOI
    10.1109/PAC.2003.1289660
  • Filename
    1289660