DocumentCode :
428774
Title :
Integrated scheduling of material handling and manufacturing activities in flexible manufacturing system
Author :
Sankar, S. Saravana ; Rajkumar, R. ; Ponnambalam, S.G. ; Gurumarimuth, M.
Author_Institution :
Dept. of Mech. Eng., Arulmigu Kalasalingam Coll. of Eng., India
Volume :
5
fYear :
2004
fDate :
10-13 Oct. 2004
Firstpage :
4254
Abstract :
This paper deals with the simultaneous scheduling of incoming jobs, machines, and vehicle dispatching in flexible manufacturing system (FMS) having a single device automated guided vehicle (AGV). The objective is to find an order in which the jobs enter into the FMS, reducing the waiting times due to the blocking and non-availability of resources needed as well as the deadheading time resulting in overall reduction in make-span of products. In this work a meta-heuristic algorithm, scatter search based iterative procedure, which accommodates the combinatorial nature of the problem, is proposed to approximately solve the integrated scheduling problem. The procedure is evaluated through different benchmark problems and the outcome of the study is encouraging and paves ample scope for further research in this area.
Keywords :
automatic guided vehicles; flexible manufacturing systems; iterative methods; materials handling; scheduling; search problems; automated guided vehicle; flexible manufacturing system; integrated scheduling problem; materials handling; metaheuristic algorithm; scatter search based iterative procedure; vehicle dispatching; Automotive engineering; Dispatching; Educational institutions; Flexible manufacturing systems; Job shop scheduling; Materials handling; Mechanical engineering; Production; Scattering; Vehicles;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Systems, Man and Cybernetics, 2004 IEEE International Conference on
ISSN :
1062-922X
Print_ISBN :
0-7803-8566-7
Type :
conf
DOI :
10.1109/ICSMC.2004.1401199
Filename :
1401199
Link To Document :
بازگشت