DocumentCode
454022
Title
Gas insulated transmission lines (GIL) with spare phase-new concepts for investment reductions
Author
Schöffner, G. ; Oswald, K.
Author_Institution
Siemens AG, Germany
fYear
2006
fDate
28-31 March 2006
Firstpage
99
Lastpage
104
Abstract
EHV transmission systems of power utilities use the N-1 principle for planning purposes. With very long distances the application of two full systems is limited because of reliability reasons and economical limits. Among others, one measure for increasing the reliability of a single three phase system is the use of an additional spare phase. In order to achieve approximately the same reliability of a double system GIL only a further spare phase with a suitable switching unit has to be applied. This enables the chance of reduced investment and lifecycle costs without reduction of reliability. The sensibility of this solution and the savings achievable depend on the boundary conditions of each project.
Keywords
cost reduction; gas insulated transmission lines; life cycle costing; power transmission faults; power transmission planning; power transmission reliability; EHV transmission system planning; GIL; N-1 principle; gas insulated transmission line; investment reduction; lifecycle cost reduction; power utility; reliability; spare phase concept; three phase system;
fLanguage
English
Publisher
iet
Conference_Titel
AC and DC Power Transmission, 2006. ACDC 2006. The 8th IEE International Conference on
Conference_Location
IET
ISSN
0537-9989
Print_ISBN
0-86341-613-6
Type
conf
Filename
1633622
Link To Document