DocumentCode
464645
Title
Case Study WCML AT System
Author
Stainton, Richard
fYear
2007
fDate
14-18 May 2007
Firstpage
23
Lastpage
24
Abstract
To meet the increase in demand, and maintain an operational railway of the West Coast Main Line, it was decided to upgrade the power supply along the main spine of the route using auto transformer (AT) technology in a staged approach. The techniques described in this paper demonstrate that the advantages of autotransformer technology can be applied to complex existing multi track railways.
Keywords
autotransformers; traction power supplies; autotransformer technology; multitrack railway power supply; west coast main line;
fLanguage
English
Publisher
iet
Conference_Titel
Railway Electrification Infrastructure and Systems, 2007 3rd IET Professional Development Course on
Conference_Location
Birmingham
ISSN
0538-9989
Print_ISBN
978-086341-7986
Type
conf
Filename
4243579
Link To Document