DocumentCode
466362
Title
Large integration of wind power: the Spanish experience
Author
Rodríguez-García, JuanMa ; Domínguez, Tomás ; Alonso, Juan F. ; Imaz, Luis
Author_Institution
Red Electr. de Espana, Paseo del Conde de los Gaitanes, Alcobendas
fYear
2007
fDate
24-28 June 2007
Firstpage
1
Lastpage
5
Abstract
There are over 11000 MW of installed wind power in the Spanish Electrical System. This amount of installed power, compared with a load peak around 43700 MW, has a big impact on system operation. The already collected real-time experience and the events experienced have created an interesting background for the integration of wind energy without jeopardising the actual levels of quality and allowing the achievement of the national and European environmental targets. This paper describes the actual situation of the integration of wind power in Spain and reports the experience and the developments put in place for a harmonized integration of wind energy.
Keywords
power supply quality; wind power; wind power plants; European environmental target; Spanish Electrical System; power quality; power system operation; wind power generation; wind power integration; Continuous improvement; Economic forecasting; Power system relaying; Production systems; Voltage; Wind energy; Wind energy generation; Wind farms; Wind forecasting; Wind power generation; Power generation dispatch; Power system security; Power system transient stability; Wind energy; Wind power generation;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering Society General Meeting, 2007. IEEE
Conference_Location
Tampa, FL
ISSN
1932-5517
Print_ISBN
1-4244-1296-X
Electronic_ISBN
1932-5517
Type
conf
DOI
10.1109/PES.2007.386209
Filename
4275975
Link To Document