• DocumentCode
    477846
  • Title

    Evaluating Degree of Success in Power Plant Construction Project Based on Fuzzy Neural Network

  • Author

    Huang, Yuansheng ; Liu, Qingchao ; Qiu, Zilong ; Wang, Mingyan

  • Author_Institution
    Dept. of Econ. & Manage., North China Electr. Power Univ., Baoding
  • Volume
    3
  • fYear
    2008
  • fDate
    18-20 Oct. 2008
  • Firstpage
    206
  • Lastpage
    210
  • Abstract
    Using fuzzy neural network to evaluate the degree of success in power plant is this paper´s innovative points. First we give an index system, and then use the relative membership degree processing the date, which as the input sample of neural network. Then use PSO algorithm optimizes the BP neural network algorithm. Use this improved BP neural network to evaluate. It is more accuracy and speedily than BP neural network algorithm. Lastly, we can get a satisfaction result. This can be guiding the project construction.
  • Keywords
    backpropagation; fuzzy neural nets; fuzzy set theory; power engineering computing; power plants; backpropagation neural networks; fuzzy neural network; particle swarm optimisation; power plant construction project; relative membership degree processing; Clustering algorithms; Conference management; Feedforward neural networks; Fuzzy neural networks; Fuzzy systems; Investments; Neural networks; Neurons; Power generation; Project management; PSO; evaluating degree of success; neural network; power plant construction project;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Fuzzy Systems and Knowledge Discovery, 2008. FSKD '08. Fifth International Conference on
  • Conference_Location
    Shandong
  • Print_ISBN
    978-0-7695-3305-6
  • Type

    conf

  • DOI
    10.1109/FSKD.2008.69
  • Filename
    4666241