DocumentCode
478014
Title
Grid Workflow Scheduling Based on the Resource Combination Reliability
Author
Tian, Guo-Zhong ; Yu, Jiong
Author_Institution
Sch. of Inf. Sci. & Eng., Xinjiang Univ., Urumqi
Volume
1
fYear
2008
fDate
18-20 Oct. 2008
Firstpage
207
Lastpage
211
Abstract
To the time-constrained workflow scheduling in grids, this paper proposes a new scheduling algorithm in terms of the finite-state continuous-time Markov process through selecting a resource combination scheme which has the lowest expenditure under the certain credit level of the resource reliability on the critical path in the DAG-based workflow. The simulation shows the validity of theory analysis.
Keywords
Markov processes; grid computing; scheduling; finite-state continuous-time Markov process; grid workflow scheduling; resource combination reliability; Availability; Costs; Dynamic scheduling; Grid computing; Information science; Markov processes; Processor scheduling; Reliability engineering; Resource management; Scheduling algorithm; critical path; critical region reliability; grid workflow scheduling; time constraint;
fLanguage
English
Publisher
ieee
Conference_Titel
Natural Computation, 2008. ICNC '08. Fourth International Conference on
Conference_Location
Jinan
Print_ISBN
978-0-7695-3304-9
Type
conf
DOI
10.1109/ICNC.2008.234
Filename
4666840
Link To Document