• DocumentCode
    478949
  • Title

    Agent Risk Evaluation in Agent-Construction System Based on Analytic Hierarchy Process

  • Author

    Chen, Jingru ; Zheng, Shaoying ; Yang, Shujuan ; Liang, Zhenhui

  • Author_Institution
    Sch. of Civil Eng., Qingdao Technol. Univ., Qingdao
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    As one of the significant reform methods to improve the management level of government investment project, agent-construction system has been applied in many places. During the process of agent construction, agent assumes considerable risk. This paper identifies the main risks of agent. Based on the analytic hierarchy process method, the main risk and relative influence factors are analyzed and evaluated. The importance degree order of main risks and relative influence factors are put forward. The research of this paper can be referred by risk management engineers in agent-construction projects.
  • Keywords
    investment; project management; risk analysis; agent construction; agent risk evaluation; agent- construction system; agent-construction system; analytic hierarchy process; government investment project management level; Civil engineering; Contracts; Engineering management; Government; Interference; Investments; Project management; Risk analysis; Risk management; Technology management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.2493
  • Filename
    4680682