DocumentCode
479138
Title
Simulation Research on Production Scheduling of Semiconductor Probing System
Author
Tie-zhu Zhang ; Yue-Peng Wang
Author_Institution
Economic & Manage. Sch., Harbin Univ. of Sci. & Technol., Harbin
fYear
2008
fDate
12-14 Oct. 2008
Firstpage
1
Lastpage
4
Abstract
In view of semiconductor probe system´s production scheduling problem, with the thought of object-oriented, a probe behavior model is set up in terms of the figuration of UML which is a model tool. It uses the SimTalk brought by EM-plant to transform behavior model directly into simulation model. By analyzing the experimental result of simulation model, the influence of the wafer releasing speed and machine dispatching upon system performance indicators such as system capability, production cycle, utilization of machines and quantity of work in process are got. It supplies the decision maker with evidence.
Keywords
Unified Modeling Language; object-oriented methods; production engineering computing; scheduling; semiconductor device manufacture; UML; machine dispatching; production cycle; production scheduling; semiconductor probing system; system capability; wafer releasing speed; Circuits; Dispatching; Fabrication; Graphics; Object oriented modeling; Probes; Production systems; Semiconductor device modeling; Technology management; Unified modeling language;
fLanguage
English
Publisher
ieee
Conference_Titel
Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
Conference_Location
Dalian
Print_ISBN
978-1-4244-2107-7
Electronic_ISBN
978-1-4244-2108-4
Type
conf
DOI
10.1109/WiCom.2008.2762
Filename
4680951
Link To Document