• DocumentCode
    479138
  • Title

    Simulation Research on Production Scheduling of Semiconductor Probing System

  • Author

    Tie-zhu Zhang ; Yue-Peng Wang

  • Author_Institution
    Economic & Manage. Sch., Harbin Univ. of Sci. & Technol., Harbin
  • fYear
    2008
  • fDate
    12-14 Oct. 2008
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    In view of semiconductor probe system´s production scheduling problem, with the thought of object-oriented, a probe behavior model is set up in terms of the figuration of UML which is a model tool. It uses the SimTalk brought by EM-plant to transform behavior model directly into simulation model. By analyzing the experimental result of simulation model, the influence of the wafer releasing speed and machine dispatching upon system performance indicators such as system capability, production cycle, utilization of machines and quantity of work in process are got. It supplies the decision maker with evidence.
  • Keywords
    Unified Modeling Language; object-oriented methods; production engineering computing; scheduling; semiconductor device manufacture; UML; machine dispatching; production cycle; production scheduling; semiconductor probing system; system capability; wafer releasing speed; Circuits; Dispatching; Fabrication; Graphics; Object oriented modeling; Probes; Production systems; Semiconductor device modeling; Technology management; Unified modeling language;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Wireless Communications, Networking and Mobile Computing, 2008. WiCOM '08. 4th International Conference on
  • Conference_Location
    Dalian
  • Print_ISBN
    978-1-4244-2107-7
  • Electronic_ISBN
    978-1-4244-2108-4
  • Type

    conf

  • DOI
    10.1109/WiCom.2008.2762
  • Filename
    4680951