Title :
Scheduling of a Reversing Slab Mill
Author :
Xie, C.Y. ; Smith, H-LW
Author_Institution :
Department of Automation, The Central-South Institute of Mining and Metallurgy, China
Abstract :
This article discusses a method of devising schedules for rolling hot steel ingots to slab thickness in minimum time, subject to constraints on draft, rolling force, rolling torque and motor power. Discrete dynamic programming is used as a tool to solve the problem. A computer program for computing the schedule is also presented.
Keywords :
Conducting materials; Dynamic programming; Milling machines; Power engineering computing; Processor scheduling; Slabs; Steel; Strips; Time factors; Torque;
Conference_Titel :
American Control Conference, 1982
Conference_Location :
Arlington, VA, USA