DocumentCode :
489994
Title :
Forward and Backward Planning based on Object-Oriented Simulation
Author :
Boukachour, J.
Author_Institution :
LIR, Laboratoire d´´Informatique de Rouen, Université de Rouen, BP 118, F-76134 Mt-St-Aignan Cedex France.
fYear :
1992
fDate :
24-26 June 1992
Firstpage :
3218
Lastpage :
3219
Abstract :
This paper shows a scheduling system written on CLOS which uses waiting queues simulation technique, a discrete event driving, based on an object-oriented approach. This system allows to achieve like another classical simulation scheduling system forward plannings and also backward plannings. Main system feates are given here.
Keywords :
Clocks; Discrete event simulation; Iron; Job shop scheduling; Materials requirements planning; Object oriented modeling; Process control; Process planning; Virtual manufacturing; Workstations;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
American Control Conference, 1992
Conference_Location :
Chicago, IL, USA
Print_ISBN :
0-7803-0210-9
Type :
conf
Filename :
4792743
Link To Document :
بازگشت