    Heuristic Algorithm in Optimizing Stochastic Resource-Constrained Project Scheduling

  • Author

    Guo, Fang Ming ; Ma, Li ; He, Min

  • Author_Institution
    Digital Eng. & Simulation Res. Center, HUST, Wuhan, China
  • Volume
    1
  • fYear
    2009
  • fDate
    24-26 April 2009
  • Firstpage
    975
  • Lastpage
    978
  • Abstract
    This paper presents a newly developed resource constrained project scheduling method in stochastic networks by using critical chain concept. The objective of the presented model is defined as minimizing the multiplication of expected project duration and its variance. This paper suggests a competition routine by implementing a policy to maximize the total contribution of selected activities in reducing the expected project duration and its variance. In this respect, a heuristic algorithm is developed and compared with the other existing methods.
  • Keywords
    minimisation; project management; resource allocation; scheduling; stochastic processes; critical chain project management; expected project duration minimization; heuristic algorithm; optimization; resource utilization function; stochastic resource-constrained project scheduling; Computational modeling; Heuristic algorithms; Mathematical model; Mathematics; Processor scheduling; Random variables; Reactive power; Scheduling algorithm; Stochastic processes; Telecommunication computing;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Computational Sciences and Optimization, 2009. CSO 2009. International Joint Conference on
  • Conference_Location
    Sanya, Hainan
  • Print_ISBN
    978-0-7695-3605-7
  • Type

    conf

  • DOI
    10.1109/CSO.2009.495
  • Filename
    5193856