Author :
Kral, Vaclav ; Prochazka, Karel ; Kysnar, Frantisek
Abstract :
In many cases, renewable energy sources are built in locations where the distribution system has not sufficient capacity for connecting their power output into the network. Relatively long MV cable routes - even 15 to 20 km long - with a corresponding capacitive reactive power are being built for the connection of these sources to the distribution system at a suitable point of connection. Distribution system operators require from the manufacturer, in the whole range of output power, to maintain a neutral power factor at the point of common coupling (PCC) and/or, in the case of sources with higher power, their integration into the voltage regulation system. For fulfillment of these conditions, a regulator of the reactive power flow must be included into the connection of the wind park into the network.