Integrated production planning and scheduling using backward/forward scheduling simulation
Author
Hirano, Shinji ; Kobayashi, Shigeo ; Eguchi, Toru
Author_Institution
Grad. Sch. of Eng., Hiroshima Univ., Hiroshima, Japan
fYear
2009
fDate
18-21 Aug. 2009
Firstpage
2631
Lastpage
2635
Abstract
This paper deals with release time planning to reduce lead times of jobs in make-to-order production environments. In traditional MRP-based planning system, lead times are estimated using historical data and past experience without precisely considering capacity constraints. The proposed method in this paper is based on precise backward and forward scheduling simulation. First, backward simulation in which simulation starts at each due date of job and sends it through the shop floor based on the backward sequence of its part routing is applied. Next, forward simulation is applied to modify the release times obtained by backward simulation. A genetic algorithm is also used to minimize lead times of jobs in the final step. Numerical experiments of planning and scheduling with processing time uncertainty are carried out to examine the effectiveness of the proposed method.
Keywords
genetic algorithms; production planning; scheduling; backward-forward scheduling simulation; genetic algorithm; make-to-order production environments; production planning; production scheduling; release time planning; Capacity planning; Genetic algorithms; Job production systems; Job shop scheduling; Lead time reduction; Materials requirements planning; Product design; Production planning; Routing; Uncertainty; Backward scheduling; Forward scheduling; Job Shop; Lead time; Priority Rule; Release time;
fLanguage
English
Publisher
ieee
Conference_Titel
ICCAS-SICE, 2009
Conference_Location
Fukuoka
Print_ISBN
978-4-907764-34-0
Electronic_ISBN
978-4-907764-33-3
Type
conf
Filename
5335166
Link To Document