• DocumentCode
    514781
  • Title

    Analysis of Symbolic Deduction Based Scheduling Algorithm for the Production Scheduling Problem Under Time Uncertainty

  • Author

    Wang Zheng ; Song Ying ; Zhang Yuxian

  • Author_Institution
    Dept. of Autom., Tsinghua Univ., Beijing, China
  • Volume
    1
  • fYear
    2010
  • fDate
    13-14 March 2010
  • Firstpage
    555
  • Lastpage
    558
  • Abstract
    This paper analyzes the symbolic deduction based scheduling algorithm (SDBSA) for the production scheduling problem under time uncertainty in detail. First, the uncertain interval based symbolic deduction method (UIBSDM) which is used to deal with time uncertainty is analyzed in theory. Second, the adaptability of UIBSDM based scheduling plan and the effectiveness of dispatching rules are analyzed in simulation experiments. Numerical computational results show that SDBSA is effective for the problem of production scheduling under time uncertainty.
  • Keywords
    numerical analysis; planning; production control; dispatching rules; production scheduling problem; scheduling plan; symbolic deduction based scheduling algorithm; time uncertainty; uncertain interval based symbolic deduction method; Algorithm design and analysis; Analytical models; Automation; Computational modeling; Dispatching; Processor scheduling; Production; Scheduling algorithm; Time measurement; Uncertainty; production scheduling; symbolic deduction; uncertainty;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Measuring Technology and Mechatronics Automation (ICMTMA), 2010 International Conference on
  • Conference_Location
    Changsha City
  • Print_ISBN
    978-1-4244-5001-5
  • Electronic_ISBN
    978-1-4244-5739-7
  • Type

    conf

  • DOI
    10.1109/ICMTMA.2010.372
  • Filename
    5459028