• DocumentCode
    515121
  • Title

    An algorithm for improving Shapley Value method for time claim in concurrent delay

  • Author

    Cui, Dong-hong ; Yao, Li ; Yang, Rong

  • Author_Institution
    Dept. of Manage., Shenyang Univ. of Technol., Shenyang, China
  • Volume
    2
  • fYear
    2010
  • fDate
    9-10 Jan. 2010
  • Firstpage
    893
  • Lastpage
    897
  • Abstract
    As a special form of construction claims, concurrent delay claim widely exists in construction claim events. At the same time, how to deal with time claim in concurrent delay correctly has became one of the difficult contents in construction claims. Based on Shapely Value method and fuzzy comprehensive evaluation method, this paper presents an ameliorative algorithm for Shapely Value method. In this algorithm, time delay responsibility is allotted to each single responsible activity by Shapley Value, and then allotted between the owner and the contractor in each single responsible activity by means of fuzzy comprehensive evaluation method.
  • Keywords
    construction industry; contracts; financial management; fuzzy set theory; game theory; Shapley value method; concurrent delay claim; construction claims; fuzzy comprehensive evaluation; time claim; time delay responsibility; Costs; Delay effects; Forward contracts; Game theory; Interference; Large-scale systems; Technology management; Concurrent Delay; Fuzzy Evaluation; Responsibility-allotting; Shapley Value; Time Claim;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Logistics Systems and Intelligent Management, 2010 International Conference on
  • Conference_Location
    Harbin
  • Print_ISBN
    978-1-4244-7331-1
  • Type

    conf

  • DOI
    10.1109/ICLSIM.2010.5461055
  • Filename
    5461055