    Research on cost modified forecast model based on correlation of project

  • Author

    Yingjie, Liu ; Ping, Feng

  • Author_Institution
    Sch. of Civil Eng., TianJin Univ., Tianjin, China
  • fYear
    2010
  • fDate
    11-13 May 2010
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    Considering correlation of work in project, this paper develops a cost modified prediction in project, which measures the correlation of each work or project using exponential correlation function, modifies the expectation value and covariance of the uncompleted work or project using the completed based on Bayes theorem, and then predicts the total cost of project under the given confidence level. This model can achieve early warning if the manager provides the limits to the cost of project.
  • Keywords
    Accuracy; Civil engineering; Contingency management; Cost function; Covariance matrix; Engineering management; Predictive models; Project management; Uncertainty; Water conservation; Bayes´ Theorem; correlation; cost; forecast model;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Networked Computing (INC), 2010 6th International Conference on
  • Conference_Location
    Gyeongju, Korea (South)
  • Print_ISBN
    978-1-4244-6986-4
  • Electronic_ISBN
    978-89-88678-20-6
  • Type

    conf

  • Filename
    5484799