Research on cost modified forecast model based on correlation of project
Author
Yingjie, Liu ; Ping, Feng
Author_Institution
Sch. of Civil Eng., TianJin Univ., Tianjin, China
fYear
2010
fDate
11-13 May 2010
Firstpage
1
Lastpage
4
Abstract
Considering correlation of work in project, this paper develops a cost modified prediction in project, which measures the correlation of each work or project using exponential correlation function, modifies the expectation value and covariance of the uncompleted work or project using the completed based on Bayes theorem, and then predicts the total cost of project under the given confidence level. This model can achieve early warning if the manager provides the limits to the cost of project.
Keywords
Accuracy; Civil engineering; Contingency management; Cost function; Covariance matrix; Engineering management; Predictive models; Project management; Uncertainty; Water conservation; Bayes´ Theorem; correlation; cost; forecast model;
fLanguage
English
Publisher
ieee
Conference_Titel
Networked Computing (INC), 2010 6th International Conference on
Conference_Location
Gyeongju, Korea (South)
Print_ISBN
978-1-4244-6986-4
Electronic_ISBN
978-89-88678-20-6
Type
conf
Filename
5484799
Link To Document