DocumentCode
537657
Title
Application of Trigger Point Mechanism in Time Decision-Making of Freeway Reconstruction and Extension
Author
Haiqian, Cheng ; Hongxin, Guan ; Tiexin, Liu
Author_Institution
Wuhan Univ. of Technol., Wuhan, China
Volume
1
fYear
2010
fDate
11-12 Nov. 2010
Firstpage
286
Lastpage
288
Abstract
The adaptation of freeway to economy development is a sustaining and dynamic process, which presents a state from adaptation to no adaptation and to adaptation. The decision on the reconstruction and extension time of freeway is an important macroscopical decision-making matter. On the basis of analyzing the service level of freeway and the principle of trigger point mechanism, this paper has constructed time decision-making model of freeway reconstruction and extension and put forward the application method of the model. Besides, taking the Shui Guan freeway reconstruction and extension project in Shenzhen as example, an empirical analysis has been made to check the feasibility and efficiency of the model, which provides decision basis to determine reconstruction and extension time.
Keywords
construction industry; decision making; road building; roads; Shenzhen; economy development; freeway extension; freeway reconstruction; macroscopical decision-making; time decision-making; trigger point mechanism; Reconstruction and extension of freeway; Service Level; Time Decision-making; Trigger Point Mechanism;
fLanguage
English
Publisher
ieee
Conference_Titel
Optoelectronics and Image Processing (ICOIP), 2010 International Conference on
Conference_Location
Haiko
Print_ISBN
978-1-4244-8683-0
Type
conf
DOI
10.1109/ICOIP.2010.127
Filename
5662985
Link To Document