DocumentCode
554179
Title
Notice of Retraction
Risk analysis techniques for multipurpose reservoir scheduling
Author
Liping Wang ; Haitao Huang ; Yanke Zhang ; Jinyan Zhan
Author_Institution
Renewable Energy Sch., North China Electr. Power Univ., Beijing, China
Volume
3
fYear
2011
fDate
26-28 July 2011
Firstpage
1275
Lastpage
1279
Abstract
Notice of Retraction
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Risk analysis can describe the future scheduling decision risk, which is important for multipurpose reservoir to get the best utilization efficiency. On the basis of reservoir utilization scheduling characteristics involving multiple objectives, constraints and many uncertainties, from the start of the basic meaning of risk analysis, a risk analysis framework for multipurpose reservoir scheduling was proposed, which is focus on analysis of decision-making of multi-objective optimization scheme, including the objective value function, risk evaluation index system and evaluation model weights, and finally a common purpose reservoir scheduling risk analysis techniques and methods is established. The example shows that the theoretical method is effective. The relationship curve about risk and benefit proved, reflects the mean of risk analysis, is also helpful for decision makers with different risk preferences to scheme scheduling decisions, and provides a technical support for the multipurpose reservoir scheduling.
After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.
We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.
The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.
Risk analysis can describe the future scheduling decision risk, which is important for multipurpose reservoir to get the best utilization efficiency. On the basis of reservoir utilization scheduling characteristics involving multiple objectives, constraints and many uncertainties, from the start of the basic meaning of risk analysis, a risk analysis framework for multipurpose reservoir scheduling was proposed, which is focus on analysis of decision-making of multi-objective optimization scheme, including the objective value function, risk evaluation index system and evaluation model weights, and finally a common purpose reservoir scheduling risk analysis techniques and methods is established. The example shows that the theoretical method is effective. The relationship curve about risk and benefit proved, reflects the mean of risk analysis, is also helpful for decision makers with different risk preferences to scheme scheduling decisions, and provides a technical support for the multipurpose reservoir scheduling.
Keywords
decision making; optimisation; reservoirs; risk analysis; scheduling; decision risk scheduling; decision-making; multiobjective optimization scheme; multipurpose reservoir scheduling; objective value function; reservoir scheduling risk analysis techniques; reservoir utilization scheduling characteristics; risk evaluation index system; Floods; Indexes; Navigation; Optimal scheduling; Power generation; Reservoirs; multi-objective evaluation; reservoir scheduling; risk analysis; water management;
fLanguage
English
Publisher
ieee
Conference_Titel
Natural Computation (ICNC), 2011 Seventh International Conference on
Conference_Location
Shanghai
ISSN
2157-9555
Print_ISBN
978-1-4244-9950-2
Type
conf
DOI
10.1109/ICNC.2011.6022520
Filename
6022520
Link To Document