• DocumentCode
    554179
  • Title

    Notice of Retraction
    Risk analysis techniques for multipurpose reservoir scheduling

  • Author

    Liping Wang ; Haitao Huang ; Yanke Zhang ; Jinyan Zhan

  • Author_Institution
    Renewable Energy Sch., North China Electr. Power Univ., Beijing, China
  • Volume
    3
  • fYear
    2011
  • fDate
    26-28 July 2011
  • Firstpage
    1275
  • Lastpage
    1279
  • Abstract
    Notice of Retraction

    After careful and considered review of the content of this paper by a duly constituted expert committee, this paper has been found to be in violation of IEEE´s Publication Principles.

    We hereby retract the content of this paper. Reasonable effort should be made to remove all past references to this paper.

    The presenting author of this paper has the option to appeal this decision by contacting TPII@ieee.org.

    Risk analysis can describe the future scheduling decision risk, which is important for multipurpose reservoir to get the best utilization efficiency. On the basis of reservoir utilization scheduling characteristics involving multiple objectives, constraints and many uncertainties, from the start of the basic meaning of risk analysis, a risk analysis framework for multipurpose reservoir scheduling was proposed, which is focus on analysis of decision-making of multi-objective optimization scheme, including the objective value function, risk evaluation index system and evaluation model weights, and finally a common purpose reservoir scheduling risk analysis techniques and methods is established. The example shows that the theoretical method is effective. The relationship curve about risk and benefit proved, reflects the mean of risk analysis, is also helpful for decision makers with different risk preferences to scheme scheduling decisions, and provides a technical support for the multipurpose reservoir scheduling.
  • Keywords
    decision making; optimisation; reservoirs; risk analysis; scheduling; decision risk scheduling; decision-making; multiobjective optimization scheme; multipurpose reservoir scheduling; objective value function; reservoir scheduling risk analysis techniques; reservoir utilization scheduling characteristics; risk evaluation index system; Floods; Indexes; Navigation; Optimal scheduling; Power generation; Reservoirs; multi-objective evaluation; reservoir scheduling; risk analysis; water management;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Natural Computation (ICNC), 2011 Seventh International Conference on
  • Conference_Location
    Shanghai
  • ISSN
    2157-9555
  • Print_ISBN
    978-1-4244-9950-2
  • Type

    conf

  • DOI
    10.1109/ICNC.2011.6022520
  • Filename
    6022520