DocumentCode
555510
Title
A contractor prequalification model based on triangular fuzzy number and TOPSIS
Author
Wei, Zhen ; Wang, Xue-qing ; Guo, Qing-e
Author_Institution
Coll. of Manage. & Econ, Tianjin Univ., Tianjin, China
Volume
Part 1
fYear
2011
fDate
3-5 Sept. 2011
Firstpage
1
Lastpage
4
Abstract
Contractor prequalification is the process of choosing the competent contractor to bidding, during this process, the construction owner should to evaluate many aspects of contractors´ abilities, such as financial standing, technical ability, experience and credibility. All these criteria both have quantitative and qualitative criteria, the qualitative criteria often difficult to be quantified, and it is a difficult task to determine one common scale of appraisal for all the criteria. So in this paper the author use the linguistics variables to evaluate the criteria that the given contractors satisfying and the importance weight of the criteria, then translate the linguistics variables into triangular fuzzy numbers, and using the TOPSIS method to calculate the fuzzy positive ideal solution and fuzzy negative ideal solution and the relative closeness to the ideal solution by every contractor, finally the most competent contractor is found.
Keywords
construction; fuzzy set theory; TOPSIS; bidding; competent contractor; construction owner; contractor prequalification model; credibility; financial standing; fuzzy negative ideal solution; fuzzy positive ideal solution; qualitative criteria; quantitative criteria; technical ability; triangular fuzzy number; Appraisal; Artificial neural networks; Decision making; Educational institutions; Expert systems; Fuzzy sets; Pragmatics; Fuzzy sets; TOPSIS; prequalification; triangular fuzzy number;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location
Changchun
Print_ISBN
978-1-61284-446-6
Type
conf
DOI
10.1109/ICIEEM.2011.6035091
Filename
6035091
Link To Document