• DocumentCode
    555684
  • Title

    The application of six sigma methods in Packing Line Y of Company A

  • Author

    Shu, Jun-yi ; Liu, Liang

  • Author_Institution
    Univ. of Sci. & Technol. Beijing, Beijing, China
  • Volume
    Part 2
  • fYear
    2011
  • fDate
    3-5 Sept. 2011
  • Firstpage
    1071
  • Lastpage
    1074
  • Abstract
    Facing the phenomena of high downtime and high outage rate, unstable OEE level of the equipment and unable to achieve the best level on Packing Line Y of Company A we use six sigma analysis tools for finding the various downtime reasons on Packing Line Y and then find out the key influence factors to OEE level, and present some improvement.
  • Keywords
    packaging; production equipment; six sigma (quality); OEE method; equipment downtime reasons; key influence factors; overall equipment effectiveness method; packing line; six sigma methods; Companies; Educational institutions; Manufacturing; Packaging; Preventive maintenance; Production; Six sigma; DMAIC model; Improvement; OEE method; Pareto diagram;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
  • Conference_Location
    Changchun
  • Print_ISBN
    978-1-61284-446-6
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2011.6035341
  • Filename
    6035341