DocumentCode
555684
Title
The application of six sigma methods in Packing Line Y of Company A
Author
Shu, Jun-yi ; Liu, Liang
Author_Institution
Univ. of Sci. & Technol. Beijing, Beijing, China
Volume
Part 2
fYear
2011
fDate
3-5 Sept. 2011
Firstpage
1071
Lastpage
1074
Abstract
Facing the phenomena of high downtime and high outage rate, unstable OEE level of the equipment and unable to achieve the best level on Packing Line Y of Company A we use six sigma analysis tools for finding the various downtime reasons on Packing Line Y and then find out the key influence factors to OEE level, and present some improvement.
Keywords
packaging; production equipment; six sigma (quality); OEE method; equipment downtime reasons; key influence factors; overall equipment effectiveness method; packing line; six sigma methods; Companies; Educational institutions; Manufacturing; Packaging; Preventive maintenance; Production; Six sigma; DMAIC model; Improvement; OEE method; Pareto diagram;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
Conference_Location
Changchun
Print_ISBN
978-1-61284-446-6
Type
conf
DOI
10.1109/ICIEEM.2011.6035341
Filename
6035341
Link To Document