• DocumentCode
    555696
  • Title

    Preventive maintenance scheduling of FMS equipment based on improved ant colony algorithm

  • Author

    Xue, Hong-quan ; Wei, Sheng-min ; Yang, Lin

  • Author_Institution
    Sch. of Mech. Eng., Northwestern Polytech. Univ., Xi´´an, China
  • Volume
    Part 2
  • fYear
    2011
  • fDate
    3-5 Sept. 2011
  • Firstpage
    1128
  • Lastpage
    1131
  • Abstract
    The importance of preventive maintenance scheduling has been gradually recognized by decision makers as it includes the necessary tasks to avoid flexible manufacturing system (FMS) unavailability. The PM scheduling of FMS machines is NP-hard problem. ACOA is an efficient method to solve NP-hard problem. This paper put forward an improved algorithm based on multiple ant colonies to solve the PM scheduling plan of FMS machines. Experimental results of a preventive maintenance scheduling of FMS equipment indicate the effectiveness of the adaptive strategies and the efficiency of the multiple ant colonies algorithm.
  • Keywords
    computational complexity; flexible manufacturing systems; optimisation; preventive maintenance; scheduling; FMS equipment; FMS machines; NP-hard problem; flexible manufacturing system; improved ant colony algorithm; preventive maintenance scheduling; Algorithm design and analysis; Job shop scheduling; Preventive maintenance; Processor scheduling; Single machine scheduling; Preventive Maintenance; flexible manufacturing system; mass customization; multiple ant colonies algorithm;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Industrial Engineering and Engineering Management (IE&EM), 2011 IEEE 18Th International Conference on
  • Conference_Location
    Changchun
  • Print_ISBN
    978-1-61284-446-6
  • Type

    conf

  • DOI
    10.1109/ICIEEM.2011.6035354
  • Filename
    6035354