DocumentCode
560308
Title
Standard Operation Research of Axle Box Key Production Line Process
Author
Bai, Jie ; Yao, Huiru ; Sun, Li
Author_Institution
Coll. of Mech. Eng., Dalian Jiaotong Univ., Dalian, China
Volume
1
fYear
2011
fDate
26-27 Nov. 2011
Firstpage
436
Lastpage
439
Abstract
This paper is based on X factory as an actual research field. We reached on the actual problems of the key process in the Axle box production line. The main purpose is to make less work and more convenient operation, working environment more secure, and less processing time and improve the work efficiency after an analysis of the key process step, This article uses the 5 WlH technology and ECRS principle to improve and makes the comparison before and after improvement. It actually reduces the process steps and improves work efficiency, working environment safety.
Keywords
axles; occupational safety; 5WIH technology; ECRS principle; axle box production line process; key process step; work efficiency; working environment safety; Axles; Boring; Cranes; Milling; Presses; Surface roughness; 5W1H; ECRS principle; crank arms key procedure;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering (ICIII), 2011 International Conference on
Conference_Location
Shenzhen
Print_ISBN
978-1-61284-450-3
Type
conf
DOI
10.1109/ICIII.2011.111
Filename
6115070
Link To Document