• DocumentCode
    560672
  • Title

    The post-evaluation index system for preparatory work of transmission and transformation projects

  • Author

    Ma, Xiufan ; Lu, Siyao ; Zhou, Ying

  • Author_Institution
    North China Electr. Power Univ., Beijing, China
  • Volume
    1
  • fYear
    2011
  • fDate
    8-9 Sept. 2011
  • Firstpage
    363
  • Lastpage
    366
  • Abstract
    Considering the characteristics of the transmission and transformation project, focusing on the wink links of the preparatory work, this paper builds the post-evaluation index system of preparatory work. In accordance with the interactional relationship among the indexes, the Analytic Hierarchy Process (AHP) based evaluation model is introduced to confirm the weight of indexes. Finally, the results of an empirical analysis on a certain transmission and transformation project´s preparatory work show that this index system can dig up some key problems in preliminary management and give a good reference for subsequent projects decision-making and management level.
  • Keywords
    decision making; power transmission; AHP; analytic hierarchy process; decision-making; empirical analysis; index system; management level; post-evaluation index system; transformation projects; transmission preparatory work; Contracts; Decision making; Educational institutions; Indexes; Planning; Power transmission; index system; post-evaluation; preparatory work; transmission and transformation project;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Power Engineering and Automation Conference (PEAM), 2011 IEEE
  • Conference_Location
    Wuhan
  • Print_ISBN
    978-1-4244-9691-4
  • Type

    conf

  • DOI
    10.1109/PEAM.2011.6134875
  • Filename
    6134875