DocumentCode
560672
Title
The post-evaluation index system for preparatory work of transmission and transformation projects
Author
Ma, Xiufan ; Lu, Siyao ; Zhou, Ying
Author_Institution
North China Electr. Power Univ., Beijing, China
Volume
1
fYear
2011
fDate
8-9 Sept. 2011
Firstpage
363
Lastpage
366
Abstract
Considering the characteristics of the transmission and transformation project, focusing on the wink links of the preparatory work, this paper builds the post-evaluation index system of preparatory work. In accordance with the interactional relationship among the indexes, the Analytic Hierarchy Process (AHP) based evaluation model is introduced to confirm the weight of indexes. Finally, the results of an empirical analysis on a certain transmission and transformation project´s preparatory work show that this index system can dig up some key problems in preliminary management and give a good reference for subsequent projects decision-making and management level.
Keywords
decision making; power transmission; AHP; analytic hierarchy process; decision-making; empirical analysis; index system; management level; post-evaluation index system; transformation projects; transmission preparatory work; Contracts; Decision making; Educational institutions; Indexes; Planning; Power transmission; index system; post-evaluation; preparatory work; transmission and transformation project;
fLanguage
English
Publisher
ieee
Conference_Titel
Power Engineering and Automation Conference (PEAM), 2011 IEEE
Conference_Location
Wuhan
Print_ISBN
978-1-4244-9691-4
Type
conf
DOI
10.1109/PEAM.2011.6134875
Filename
6134875
Link To Document