    A support tool for cost and schedule integration by connecting PMIS & PgMIS

  • Author

    Park, In Ji ; Jin, Run Zhi ; Yang, Hyun Ju ; Hyun, Chang Taek

  • Author_Institution
    Dept. of Archit. Eng., Univ. of Seoul, Seoul, South Korea
  • fYear
    2011
  • fDate
    Nov. 29 2011-Dec. 1 2011
  • Firstpage
    1
  • Lastpage
    5
  • Abstract
    To revitalize domestic and international cities in the midst of a major recession, big scale mega projects have been actively promoted in recent years. However, it has been difficult to implement such projects, due to the lack of management skills and experience on the part of the project implementers. In particular, the PMIS employed to manage single projects centering on the existing construction phase has been found to have limitations in terms of the management of mega projects. As such, a PgMIS that includes program-level management skills is required. This study was conducted to develop a support tool for the efficient program-level management of the cost and schedule information occurring in the construction phase. By using the developed support tool for integrating cost and schedule, the program manager can monitor the progress of the entire project and of the individual sub-projects in real time.
  • Keywords
    construction industry; cost accounting; economic cycles; management information systems; project management; PMIS; PgMIS; construction phase; cost information; domestic cities; international cities; mega project management; program level management skill; program management information system; project management information system; recession; schedule information; support tool; Electric breakdown; Monitoring; Project management; Schedules; Standards;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Engineering and Industries (ICEI), 2011 International Conference on
  • Conference_Location
    Jeju
  • Print_ISBN
    978-1-4577-1999-8
  • Type

    conf

  • Filename
    6218545