• DocumentCode
    570002
  • Title

    An experience-oriented approach to risk of postponement in investment planning for a distribution network operator

  • Author

    Schoppitsch, D. ; Schuster, T. ; Theil, A.

  • fYear
    2012
  • fDate
    29-30 May 2012
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    This paper presents an objective, flexible and expandable model of dealing with the risk of postponement (rop) of projects in the investment plan. The 3 factor (3F-) method is used to assess the general (risk group specific and experience based) and individual (project specific) postponement risk of every project. The result is a rop priority index for the investment plan as a quantified guide for project urgency.
  • Keywords
    investment; power distribution economics; power distribution planning; project engineering; risk analysis; distribution network operator; experience oriented approach; investment planning; investment postponement risk; project urgency; rop priority index;
  • fLanguage
    English
  • Publisher
    iet
  • Conference_Titel
    Integration of Renewables into the Distribution Grid, CIRED 2012 Workshop
  • Conference_Location
    Lisbon
  • Electronic_ISBN
    978-1--84919-628-4
  • Type

    conf

  • DOI
    10.1049/cp.2012.0711
  • Filename
    6302343