DocumentCode
570113
Title
Regulation aspects of RES on distribution sytems operators: Austrian case
Author
Mandl, W. ; Werner, F. ; Barrera-Gonzalez, P.
Author_Institution
BEWAG Nezt GmbH, Austria
fYear
2012
fDate
29-30 May 2012
Firstpage
1
Lastpage
3
Abstract
As a result of the implementation of the Green Electricity Act-2012 with its improved conditions for renewable energy generators, there is currently a massive increase in the requests for grid access to all distribution system operators in Austria. This "boom" has und will have an enormous effect at all voltage levels on the distribution grids. This paper will focus on the influence of the recently new wind park projects development and the regulatory framework regarding the connection of RES installation in Austria.
Keywords
distributed power generation; electrical installation; power grids; renewable energy sources; wind power plants; Austrian case; Green Electricity Act-2012; RES installation connection; RES regulation aspect; distribution system operator; power distribution grid; renewable energy generator; wind park project;
fLanguage
English
Publisher
iet
Conference_Titel
Integration of Renewables into the Distribution Grid, CIRED 2012 Workshop
Conference_Location
Lisbon
Electronic_ISBN
978-1--84919-628-4
Type
conf
DOI
10.1049/cp.2012.0838
Filename
6302471