    A mid-years substation planning method based on the target year planning using transportation model

  • Author

    Shiju, Wang ; Zhiying, Lu

  • Author_Institution
    Sch. of Electr. Eng. & Autom., Tianjin Univ., Tianjin, China
  • fYear
    2012
  • fDate
    21-24 May 2012
  • Firstpage
    1
  • Lastpage
    4
  • Abstract
    For the past, the substation planning mostly focused on the target year planning, and the process from the current year to the target year was always overlooked. Although there were few studies taking these into account, they mainly based on the current year and positively pushed to target years, this method was hardly to be operated and it ignored the importance of the target year planning. In this work, a method of calculating the mid-years(years between the current year and the target year) substation planning based on the target year planning is proposed, the transportation model is used to calculate the power supply range. This method set an adjustable parameter to meet the needs of users, such as establishing substations and occupying plots or large-capacity substations preferentially. Based on this method, Mid-years substation planning is realized effectively.
  • Keywords
    planning; substations; large-capacity substations; midyears substation planning method; power supply range; target year planning; transportation model; Educational institutions; Electrical engineering; Optimization; Planning; Power supplies; Substations; Transportation; Load distribution; optimization; power supply range; substation capacity; substation planning; transport model;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Innovative Smart Grid Technologies - Asia (ISGT Asia), 2012 IEEE
  • Conference_Location
    Tianjin
  • Print_ISBN
    978-1-4673-1221-9
  • Type

    conf

  • DOI
    10.1109/ISGT-Asia.2012.6303380
  • Filename
    6303380