DocumentCode
575661
Title
Research on the quality control of highway - A construction project
Author
Lv Hong ; Wenli Shi ; Zhang Longhan
Author_Institution
Fac. of Mech. & Electr. Eng., Kunming Univ. of Sci. & Technol., Kunming, China
Volume
1
fYear
2012
fDate
20-21 Oct. 2012
Firstpage
302
Lastpage
305
Abstract
Quality control is the result of the implementation of a supervised project. By comparing the results of the project with the quality standard which is formulated in advance, we can find out the deviation and the reason why it exists; then put forward the improvement measures. In this article, we take the construction project of Highway A, Section III as the research object, using fishbone figure to find out the reasons which caused the quality problems, Pareto Diagram to figure out the major factors, and column diagram to explain some possible improvements in process methods. At last, through the analysis of the quality cost and reasonable quality improvement, we put forward the improvement measures of the quality cost, in order to achieve continuous improvement of the PDCA cycle.
Keywords
continuous improvement; costing; project management; quality control; road building; roads; PDCA cycle; Pareto diagram; column diagram; construction project; continuous improvement; highway; plan-do-check-act cycle; quality control; quality cost; quality improvement; quality standard; Cause effect analysis; Presses; Process control; Quality control; Roads; Standards; Column Diagram; Fishbone Figure; Highway Construction Project; Quality Control;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering (ICIII), 2012 International Conference on
Conference_Location
Sanya
Print_ISBN
978-1-4673-1932-4
Type
conf
DOI
10.1109/ICIII.2012.6339661
Filename
6339661
Link To Document