• DocumentCode
    575661
  • Title

    Research on the quality control of highway - A construction project

  • Author

    Lv Hong ; Wenli Shi ; Zhang Longhan

  • Author_Institution
    Fac. of Mech. & Electr. Eng., Kunming Univ. of Sci. & Technol., Kunming, China
  • Volume
    1
  • fYear
    2012
  • fDate
    20-21 Oct. 2012
  • Firstpage
    302
  • Lastpage
    305
  • Abstract
    Quality control is the result of the implementation of a supervised project. By comparing the results of the project with the quality standard which is formulated in advance, we can find out the deviation and the reason why it exists; then put forward the improvement measures. In this article, we take the construction project of Highway A, Section III as the research object, using fishbone figure to find out the reasons which caused the quality problems, Pareto Diagram to figure out the major factors, and column diagram to explain some possible improvements in process methods. At last, through the analysis of the quality cost and reasonable quality improvement, we put forward the improvement measures of the quality cost, in order to achieve continuous improvement of the PDCA cycle.
  • Keywords
    continuous improvement; costing; project management; quality control; road building; roads; PDCA cycle; Pareto diagram; column diagram; construction project; continuous improvement; highway; plan-do-check-act cycle; quality control; quality cost; quality improvement; quality standard; Cause effect analysis; Presses; Process control; Quality control; Roads; Standards; Column Diagram; Fishbone Figure; Highway Construction Project; Quality Control;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2012 International Conference on
  • Conference_Location
    Sanya
  • Print_ISBN
    978-1-4673-1932-4
  • Type

    conf

  • DOI
    10.1109/ICIII.2012.6339661
  • Filename
    6339661