• DocumentCode
    575818
  • Title

    Research on how to work out support resources constraint of newly-developed equipment

  • Author

    Zhu, Xuezheng ; Nie, Kunlin ; Hao, Hui ; Li, Yan

  • Author_Institution
    Inst. of Chem. Defense, Beijing, China
  • Volume
    1
  • fYear
    2012
  • fDate
    20-21 Oct. 2012
  • Firstpage
    113
  • Lastpage
    117
  • Abstract
    It is an important part of equipment integrated support to work out support resources constraint. Through long-term study, the author proposed the basic way of how to work out support resources constraint, established the mapping model reflecting the procedures from equipment mission to resources constraint and made a thorough research on specific methods of how to work out support resources constraint step by step. In addition, a case study is given as a demonstration.
  • Keywords
    product development; technical support services; equipment integrated support; equipment mission; mapping model; newly-developed equipment; support resource constraint; Chemicals; Decontamination; Maintenance engineering; Personnel; Spraying; Training; Vehicles; ILS; constraint; equipment; support resources;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    System Science, Engineering Design and Manufacturing Informatization (ICSEM), 2012 3rd International Conference on
  • Conference_Location
    Chengdu
  • Print_ISBN
    978-1-4673-0914-1
  • Type

    conf

  • DOI
    10.1109/ICSSEM.2012.6340780
  • Filename
    6340780