DocumentCode
580904
Title
Segregating preventive maintenance work for factory performance improvement
Author
Kalir, Adar
Author_Institution
Fab/Sort Manuf. Div., Intel Corp., Qiriat-Gat, Israel
fYear
2012
fDate
20-24 Aug. 2012
Firstpage
646
Lastpage
649
Abstract
The impact of Preventive Maintenance (PM) activity on the cycle time of a specific toolset or even the entire fab can be detrimental. Hence, there is strong incentive to determining the best way to carry out the required PM work content so as to optimize cycle time. In this paper, a model is proposed that optimizes the execution of PM´s for a pre-determined PM work content, with the consideration of attached setups.
Keywords
machinery; optimisation; preventive maintenance; production facilities; Machine Variability; PM activity; cycle time optimization; factory performance improvement; segregating preventive maintenance work; Availability; Equations; Manufacturing; Mathematical model; Preventive maintenance; Production facilities; Cycle Time; Machine Variability; Optimization; Preventive Maintenance;
fLanguage
English
Publisher
ieee
Conference_Titel
Automation Science and Engineering (CASE), 2012 IEEE International Conference on
Conference_Location
Seoul
ISSN
2161-8070
Print_ISBN
978-1-4673-0429-0
Type
conf
DOI
10.1109/CoASE.2012.6386368
Filename
6386368
Link To Document