• DocumentCode
    580904
  • Title

    Segregating preventive maintenance work for factory performance improvement

  • Author

    Kalir, Adar

  • Author_Institution
    Fab/Sort Manuf. Div., Intel Corp., Qiriat-Gat, Israel
  • fYear
    2012
  • fDate
    20-24 Aug. 2012
  • Firstpage
    646
  • Lastpage
    649
  • Abstract
    The impact of Preventive Maintenance (PM) activity on the cycle time of a specific toolset or even the entire fab can be detrimental. Hence, there is strong incentive to determining the best way to carry out the required PM work content so as to optimize cycle time. In this paper, a model is proposed that optimizes the execution of PM´s for a pre-determined PM work content, with the consideration of attached setups.
  • Keywords
    machinery; optimisation; preventive maintenance; production facilities; Machine Variability; PM activity; cycle time optimization; factory performance improvement; segregating preventive maintenance work; Availability; Equations; Manufacturing; Mathematical model; Preventive maintenance; Production facilities; Cycle Time; Machine Variability; Optimization; Preventive Maintenance;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Automation Science and Engineering (CASE), 2012 IEEE International Conference on
  • Conference_Location
    Seoul
  • ISSN
    2161-8070
  • Print_ISBN
    978-1-4673-0429-0
  • Type

    conf

  • DOI
    10.1109/CoASE.2012.6386368
  • Filename
    6386368