DocumentCode
597201
Title
Analysis on the pull strength´s calculation method during the construction of oil pipeline directional drilling crossing the yellow river and improvement
Author
Shi-qi Xu ; Bin Luo ; Jun Cheng ; Yuan-tai Hu
Author_Institution
Coll. of Pet. Eng., Xi´´an Shiyou Univ., Xi´´an, China
fYear
2012
fDate
23-25 Nov. 2012
Firstpage
402
Lastpage
407
Abstract
This paper reviewed the methods, which calculate the pull strength during directional drilling crossing construction of oil pipeline, both at home and aboard. And based on the analysis of these methods, the detailed research was given. At the same time, considering the peculiarity of this channel geologic structure and the technological requirements, the method, averaged standard method and unloading arch method, was given to calculate the maximal pull strength. It is practiced that, this method is instructive and meaningful to the directional drilling crossing construction.
Keywords
drilling (geotechnical); geology; pipelines; tensile strength; Yellow River; averaged standard method; channel geologic structure; oil pipeline directional drilling crossing construction; pull strength calculation method; technological requirements; unloading arch method; Drag; Educational institutions; Force; Frequency modulation; Pipelines; Rivers; Standards; directional drilling crossing; pipeline laying; pull strength;
fLanguage
English
Publisher
ieee
Conference_Titel
Piezoelectricity, Acoustic Waves and Device Applications (SPAWDA), 2012 Symposium on
Conference_Location
Shanghai
Print_ISBN
978-1-4673-4814-0
Type
conf
DOI
10.1109/SPAWDA.2012.6464119
Filename
6464119
Link To Document