• DocumentCode
    597201
  • Title

    Analysis on the pull strength´s calculation method during the construction of oil pipeline directional drilling crossing the yellow river and improvement

  • Author

    Shi-qi Xu ; Bin Luo ; Jun Cheng ; Yuan-tai Hu

  • Author_Institution
    Coll. of Pet. Eng., Xi´´an Shiyou Univ., Xi´´an, China
  • fYear
    2012
  • fDate
    23-25 Nov. 2012
  • Firstpage
    402
  • Lastpage
    407
  • Abstract
    This paper reviewed the methods, which calculate the pull strength during directional drilling crossing construction of oil pipeline, both at home and aboard. And based on the analysis of these methods, the detailed research was given. At the same time, considering the peculiarity of this channel geologic structure and the technological requirements, the method, averaged standard method and unloading arch method, was given to calculate the maximal pull strength. It is practiced that, this method is instructive and meaningful to the directional drilling crossing construction.
  • Keywords
    drilling (geotechnical); geology; pipelines; tensile strength; Yellow River; averaged standard method; channel geologic structure; oil pipeline directional drilling crossing construction; pull strength calculation method; technological requirements; unloading arch method; Drag; Educational institutions; Force; Frequency modulation; Pipelines; Rivers; Standards; directional drilling crossing; pipeline laying; pull strength;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Piezoelectricity, Acoustic Waves and Device Applications (SPAWDA), 2012 Symposium on
  • Conference_Location
    Shanghai
  • Print_ISBN
    978-1-4673-4814-0
  • Type

    conf

  • DOI
    10.1109/SPAWDA.2012.6464119
  • Filename
    6464119