DocumentCode :
601821
Title :
Cost effective BESS design for building power systems
Author :
Lee, Yong-Duk ; Park, Sung-Yeul
Author_Institution :
University of Connecticut, Department of Electrical and Computer engineering, Storrs, USA
fYear :
2013
fDate :
17-21 March 2013
Firstpage :
2198
Lastpage :
2205
Abstract :
This paper presents a battery energy storage system (BESS) to support peak load shaving and reactive power compensation in building power systems. In order to maximize the usage of BESS functions, this paper proposes a design procedure of an energy storage and sizing an inverter capacity, and its control algorithm based on actual building power data, and desired level of peak power reduction. One of the important control functions is to harmonize between battery energy and reactive power capacity of BESS. In this paper, total saving cost on shaving peak load and compensating reactive power based on the utility commercial rate was assessed. The proposed BESS design and its control algorithm resulted in improved power factor and a reduced peak load demand. To design proper inverter capacity according to the reactive power demand results in more economic benefits. Simulation based on the actual analyzed load data is used to validate and demonstrate the procedure of the proposed BESS design.
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Applied Power Electronics Conference and Exposition (APEC), 2013 Twenty-Eighth Annual IEEE
Conference_Location :
Long Beach, CA, USA
ISSN :
1048-2334
Print_ISBN :
978-1-4673-4354-1
Electronic_ISBN :
1048-2334
Type :
conf
DOI :
10.1109/APEC.2013.6520600
Filename :
6520600
Link To Document :
بازگشت