DocumentCode
614759
Title
Effect of wastes on changeover time in garment industry
Author
Kordoghli, Bessem ; Moussa, Assema
Author_Institution
Textile Eng. Lab., Monastir Univ., Monastir, Tunisia
fYear
2013
fDate
28-30 April 2013
Firstpage
1
Lastpage
3
Abstract
Nowadays, garment industries in Tunisia are adopting new strategies that producing a very large variety of garments in extremely small quantities. This means a practical difficulty of changing tools and production lines frequently. Here, a study has been carried out to find out the changeover time and the kinds of wastes in the sewing line. For two months, a series of observations and analyses of two garment factories has been taken in order to identify wastes and to eliminate them. Lean manufacturing and SMED technique are two methods that have been considered as guideline to solve those problems. Serious problems have been detected in studied sewing lines: the technological constraints due to the skill level and efficiency of mechanic´s labor and the working process.
Keywords
clothing industry; lean production; SMED technique; Tunisia; changeover time; changing tools; garment industries; lean manufacturing technique; production lines; sewing lines; single minute exchange of die method; Clothing; Companies; Production facilities; Textiles; Workstations; SMED; changeover time; garment factories; waste;
fLanguage
English
Publisher
ieee
Conference_Titel
Modeling, Simulation and Applied Optimization (ICMSAO), 2013 5th International Conference on
Conference_Location
Hammamet
Print_ISBN
978-1-4673-5812-5
Type
conf
DOI
10.1109/ICMSAO.2013.6552584
Filename
6552584
Link To Document