DocumentCode :
614782
Title :
SCADA application of a water steam cycle of a thermal power plant
Author :
Lakhoua, Mohamed Najeh
Author_Institution :
Lab. of Anal., Design & Command of Syst. (LACS), ENIT, Tunis, Tunisia
fYear :
2013
fDate :
28-30 April 2013
Firstpage :
1
Lastpage :
5
Abstract :
The aim of this paper is to present the process of water treatment in a thermal power plant (TPP) in the one hand, and an application of a supervisory control and data acquisition system (SCADA) on the other hand. In fact, almost all critical industrial infrastructures and processes are managed remotely from central control rooms, using computers and communications networks. Thus, the architecture of the supervisory system and the different steps of the supervision application of the water treatment process of a TPP have been presented. Our contribution consists in programming and visualizing new parameters of the chemical analysis (pH and conductivity) of the water - steam cycle to a SCADA system. The achieved supervision application is going to facilitate the work of both laboratory and instrumentation agents of the water treatment process in the TPP.
Keywords :
SCADA systems; power system control; steam power stations; water treatment; SCADA application; central control rooms; chemical analysis; communications networks; critical industrial infrastructures; instrumentation agents; laboratory agents; supervision application; supervisory control and data acquisition system; supervisory system; thermal power plant; water steam cycle; water treatment; water-steam cycle; Chemical analysis; Conductivity; Ions; Power generation; Process control; SCADA systems; Water pollution; SCADA; Thermal power plant; water treatment;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Modeling, Simulation and Applied Optimization (ICMSAO), 2013 5th International Conference on
Conference_Location :
Hammamet
Print_ISBN :
978-1-4673-5812-5
Type :
conf
DOI :
10.1109/ICMSAO.2013.6552607
Filename :
6552607
Link To Document :
بازگشت