• DocumentCode
    614845
  • Title

    Solving the person-based multitask shift generation problem with breaks

  • Author

    Kyngas, Nico ; Nurmi, Kimmo ; Kyngas, Jari

  • Author_Institution
    Satakunta Univ. of Appl. Sci., Pori, Finland
  • fYear
    2013
  • fDate
    28-30 April 2013
  • Firstpage
    1
  • Lastpage
    8
  • Abstract
    Good rosters have many benefits for an organization, such as lower costs, more effective utilization of resources and fairer workloads. This paper introduces the person-based multitask shift generation problem with breaks. The problem is to construct a set of shifts such that the staff demand at each timeslot is covered as well as possible. A set of real-world instances derived from the actual problems solved for various companies is presented, along with our results. This research has contributed to better systems for our industry partners.
  • Keywords
    costing; organisational aspects; personnel; resource allocation; scheduling; company; cost; fairer workload; organization; person-based multitask shift generation problem; resource utilization; staff demand; timeslot; workforce scheduling; Computational intelligence; Job shop scheduling; Optimal scheduling; Processor scheduling; Schedules; computational intelligence; real-world scheduling; shift design problem; shift generation problem; workforce scheduling;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Modeling, Simulation and Applied Optimization (ICMSAO), 2013 5th International Conference on
  • Conference_Location
    Hammamet
  • Print_ISBN
    978-1-4673-5812-5
  • Type

    conf

  • DOI
    10.1109/ICMSAO.2013.6552670
  • Filename
    6552670