• DocumentCode
    620004
  • Title

    Priority rule based heuristics for project scheduling problems with multi-skilled workforce constraints

  • Author

    Chen Di ; Sun Fu-quan ; Liu Shi-xin ; Wang Yi-fan

  • Author_Institution
    Coll. of Inf. Sci. & Eng., Northeastern Univ., Shenyang, China
  • fYear
    2013
  • fDate
    25-27 May 2013
  • Firstpage
    1846
  • Lastpage
    1849
  • Abstract
    With the arrival of the knowledge economy society, the knowledge workforce has become the key resource in business activities replacing capital, equipment, raw material and other traditional resources. Project scheduling problems with multi-skilled workforce constraints (PSPMSWC) has been becoming a hot spot in project management. In this paper, according to the present research development, and the characteristics of the PSPMSWC, we present a two-stage heuristic algorithm, which is based on "work - skills - human" three layers. The goal is to minimize the makespan. The algorithm provides different choices to the same problem, and the computational results show that the algorithm is satisfactory.
  • Keywords
    commerce; human resource management; knowledge management; minimisation; project management; raw materials; scheduling; PSPMSWC; business activity; knowledge economy society; knowledge workforce; makespan minimisation; multiskilled workforce constraints; priority rule based heuristics; project management; project scheduling problem; raw material; Educational institutions; Heuristic algorithms; Job shop scheduling; Optimized production technology; Processor scheduling; Multi-skilled; Project scheduling; Two-stage heuristics algorithm; Workforce-constrained;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (CCDC), 2013 25th Chinese
  • Conference_Location
    Guiyang
  • Print_ISBN
    978-1-4673-5533-9
  • Type

    conf

  • DOI
    10.1109/CCDC.2013.6561233
  • Filename
    6561233