  • Title

    Study and application of project acceleration measures based on ACA

  • Author

    Zhao Ping ; Zhang Xiangwei

  • Author_Institution
    Civil Eng., Xi´an Univ. of Archit. & Technol., Xi´an, China
  • fYear
    2013
  • fDate
    25-27 May 2013
  • Firstpage
    2363
  • Lastpage
    2368
  • Abstract
    In order to control the project schedule delay problem efficiently in actual construction, the mathematical model of Multi-process Cross-operating Acceleration Measures is built based on improvement of process implementation mode function expression and analysis of process duration-cost relationship after considering the logical and resource constraints. Then the feasible project schedule of some engineering example can be achieved by solving the mathematical model with ant colony algorithm which contains elite strategy. The final results prove that it could provide rational references for actual acceleration construction by comparing with enumeration algorithm.
  • Keywords
    ant colony optimisation; construction industry; costing; mathematical analysis; project management; scheduling; ACA; acceleration construction; ant colony algorithm; elite strategy; enumeration algorithm; logical constraint; mathematical model; multiprocess cross-operating acceleration measures; process duration-cost relationship; process implementation mode function expression; project acceleration measures; project schedule delay problem; resource constraint; Acceleration; Construction; Educational institutions; Employment; Mathematical model; Optimization; Schedules; Acceleration Measures Model; Ant Colony Algorithm; Duration-cost Optimization; Multi-modes;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Control and Decision Conference (CCDC), 2013 25th Chinese
  • Conference_Location
    Guiyang
  • Print_ISBN
    978-1-4673-5533-9
  • Type

    conf

  • DOI
    10.1109/CCDC.2013.6561333
  • Filename
    6561333