Study and application of project acceleration measures based on ACA
Author
Zhao Ping ; Zhang Xiangwei
Author_Institution
Civil Eng., Xi´an Univ. of Archit. & Technol., Xi´an, China
fYear
2013
fDate
25-27 May 2013
Firstpage
2363
Lastpage
2368
Abstract
In order to control the project schedule delay problem efficiently in actual construction, the mathematical model of Multi-process Cross-operating Acceleration Measures is built based on improvement of process implementation mode function expression and analysis of process duration-cost relationship after considering the logical and resource constraints. Then the feasible project schedule of some engineering example can be achieved by solving the mathematical model with ant colony algorithm which contains elite strategy. The final results prove that it could provide rational references for actual acceleration construction by comparing with enumeration algorithm.
Keywords
ant colony optimisation; construction industry; costing; mathematical analysis; project management; scheduling; ACA; acceleration construction; ant colony algorithm; elite strategy; enumeration algorithm; logical constraint; mathematical model; multiprocess cross-operating acceleration measures; process duration-cost relationship; process implementation mode function expression; project acceleration measures; project schedule delay problem; resource constraint; Acceleration; Construction; Educational institutions; Employment; Mathematical model; Optimization; Schedules; Acceleration Measures Model; Ant Colony Algorithm; Duration-cost Optimization; Multi-modes;
fLanguage
English
Publisher
ieee
Conference_Titel
Control and Decision Conference (CCDC), 2013 25th Chinese
Conference_Location
Guiyang
Print_ISBN
978-1-4673-5533-9
Type
conf
DOI
10.1109/CCDC.2013.6561333
Filename
6561333
Link To Document