DocumentCode
668442
Title
Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan
Author
Peng Liu ; Xiaoyu Tian
Author_Institution
Sch. of Manage., Shenyang Univ. of Technol., Shenyang, China
Volume
1
fYear
2013
fDate
23-24 Nov. 2013
Firstpage
487
Lastpage
489
Abstract
In this paper, we introduce a new scheduling model in which both two agents and resource consumption exist simultaneously. Two agents compete to perform their respective jobs on a common single machine and each agent has his own criterion to optimize. The starting time of each A-agent´s job is related to the amount of resource consumed. The objective is to minimize the total amount of resource consumption of agent A with the restriction that the makespan of agent B cannot exceed a given bound U. The optimal properties and the optimal polynomial time algorithm are proposed to solve the scheduling problem.
Keywords
optimisation; polynomials; single machine scheduling; job scheduling; optimal polynomial time algorithm; optimization; resource consumption minimization; two-agent single machine scheduling; Job shop scheduling; Operations research; Optimal scheduling; Processor scheduling; Schedules; Single machine scheduling; Resource consumption; Scheduling; Single machine; Two-agent;
fLanguage
English
Publisher
ieee
Conference_Titel
Information Management, Innovation Management and Industrial Engineering (ICIII), 2013 6th International Conference on
Conference_Location
Xi´an
Print_ISBN
978-1-4799-3985-5
Type
conf
DOI
10.1109/ICIII.2013.6702980
Filename
6702980
Link To Document