• DocumentCode
    668442
  • Title

    Two-agent single-machine scheduling to minimize resource consumption with a constraint on the makespan

  • Author

    Peng Liu ; Xiaoyu Tian

  • Author_Institution
    Sch. of Manage., Shenyang Univ. of Technol., Shenyang, China
  • Volume
    1
  • fYear
    2013
  • fDate
    23-24 Nov. 2013
  • Firstpage
    487
  • Lastpage
    489
  • Abstract
    In this paper, we introduce a new scheduling model in which both two agents and resource consumption exist simultaneously. Two agents compete to perform their respective jobs on a common single machine and each agent has his own criterion to optimize. The starting time of each A-agent´s job is related to the amount of resource consumed. The objective is to minimize the total amount of resource consumption of agent A with the restriction that the makespan of agent B cannot exceed a given bound U. The optimal properties and the optimal polynomial time algorithm are proposed to solve the scheduling problem.
  • Keywords
    optimisation; polynomials; single machine scheduling; job scheduling; optimal polynomial time algorithm; optimization; resource consumption minimization; two-agent single machine scheduling; Job shop scheduling; Operations research; Optimal scheduling; Processor scheduling; Schedules; Single machine scheduling; Resource consumption; Scheduling; Single machine; Two-agent;
  • fLanguage
    English
  • Publisher
    ieee
  • Conference_Titel
    Information Management, Innovation Management and Industrial Engineering (ICIII), 2013 6th International Conference on
  • Conference_Location
    Xi´an
  • Print_ISBN
    978-1-4799-3985-5
  • Type

    conf

  • DOI
    10.1109/ICIII.2013.6702980
  • Filename
    6702980