DocumentCode
685772
Title
A solution for PBUC problem using payment for power delivered and power allocated method
Author
Vasiyullah, S. F. Syed ; Gopalakrishnan, Maheshwaran
Author_Institution
EEE Dept., AMSCE, Chennai, India
fYear
2013
fDate
12-14 Dec. 2013
Firstpage
605
Lastpage
607
Abstract
Unit commitment in the power system schedules on/off states of generating unit that minimize the total fuel cost. In PBUC, the objective is to maximize the profit of the GENCO in the deregulated environment. In deregulated environment, GENCO´s works on the bases of forecasted demand, reserve and price where the objective is to maximize their profit. The proposed method uses payment for power delivered and reserve allocated to solve PBUC problem. The proposed approach has been tested on 3 units system. The results of the proposed method have been compared with traditional unit commitment.
Keywords
power generation dispatch; power generation scheduling; power markets; pricing; GENCO; PBUC problem; deregulated environment; forecasted demand; generating unit scheduling; power allocated method; power delivered method; power system scheduling; price; profit based unit commitment; profit maximization; reserve allocated method; total fuel cost minimization; Handheld computers; Deregulated environment; PBUC; competitive market; restructured;
fLanguage
English
Publisher
ieee
Conference_Titel
Green Computing, Communication and Conservation of Energy (ICGCE), 2013 International Conference on
Conference_Location
Chennai
Type
conf
DOI
10.1109/ICGCE.2013.6823507
Filename
6823507
Link To Document