DocumentCode :
690699
Title :
Active power real-time control strategy for wind farms coordinated with power system
Author :
Chengming He ; Hongtao Wang
Author_Institution :
Key Lab. of Power Syst. Intell. Dispatch & Control of Minist. of Educ., Shandong Univ., Jinan, China
fYear :
2013
fDate :
8-11 Dec. 2013
Firstpage :
1
Lastpage :
5
Abstract :
Because of the intermittent and uncertainty of wind power, the change rate and amplitude of power system net-load increase with wind power penetration growing continuously. The prediction error of wind power generation capacity is large, so it´s difficult to quantify its impact on AGC adjustment capacity and incorporate wind power maximally. To solve the problem, an active power real-time control method for wind farms considering AGC adjustment capability limits is proposed in this paper. Base on the strategy, the net-load fluctuation of next period is estimated according to the newest wind power and load predication information, the reference power of wind farm can be determined combined with the adjustment capacity of AGC. At the same time, in order to improve the value of wind power, an additional frequency control loop is design for the down-regulated wind farms. The simulation result demonstrates the feasibility of the proposed strategy.
Keywords :
power control; power system control; wind power; wind power plants; active power real-time control strategy; power system; wind farms; wind power generation; Automatic generation control; Fluctuations; Frequency control; Power system stability; Wind farms; Wind power generation; AGC adjustment capability; frequency stability; net-load fluctuation; real time control; wind power;
fLanguage :
English
Publisher :
ieee
Conference_Titel :
Power and Energy Engineering Conference (APPEEC), 2013 IEEE PES Asia-Pacific
Conference_Location :
Kowloon
Type :
conf
DOI :
10.1109/APPEEC.2013.6837202
Filename :
6837202
Link To Document :
بازگشت