DocumentCode
694060
Title
A parametric cost estimation model to develop prototype of electric vehicle based on activity-based costing
Author
Ardiansyah, R. ; Sutopo, W. ; Nizam, M.
Author_Institution
Dept. of Ind. Eng., Sebelas Maret Univ., Surakarta, Indonesia
fYear
2013
fDate
10-13 Dec. 2013
Firstpage
385
Lastpage
389
Abstract
Accurate estimation is still challenging for the development stage of a product due to lack information about the production process, bill of material, and detailed activity. Parametric cost estimation based on activity-based costing can be used to generate the cost information of the whole process from the design stage until development stage. This paper presents a parametric cost estimation model that links activity-based costing to enhance accuracy of estimation for developing an electric vehicle prototype. The parametric cost represents the development process of a prototype consisting of four main processes. It also presents activities, cost center, and cost driver in each process. The total cost of each cost center is formulated by mathematical equations. A prototype of the Sebelas Maret Electric Vehicle is chosen as a case study. The proposed model can be utilized to predict total cost estimation the prototype of electric vehicle. This estimation method can influence cost reduction of developmental stage.
Keywords
bills of materials; costing; electric vehicles; Sebelas Maret electric vehicle; activity-based costing; bill of material; detailed activity; electric vehicle; mathematical equations; parametric cost estimation model; production process; Bills of materials; Electric vehicles; Estimation; Mathematical model; Prototypes; activity-based costing; electric vehicle; parametric cost estimation; prototype;
fLanguage
English
Publisher
ieee
Conference_Titel
Industrial Engineering and Engineering Management (IEEM), 2013 IEEE International Conference on
Conference_Location
Bangkok
Type
conf
DOI
10.1109/IEEM.2013.6962439
Filename
6962439
Link To Document